Font Size: a A A

Study On Evaluation Of Railway Arrangement Scheme Of Xinghe And Shangdu

Posted on:2016-09-09Degree:MasterType:Thesis
Country:ChinaCandidate:P WuFull Text:PDF
GTID:2132330464469176Subject:Traffic and Transportation Engineering
Abstract/Summary:PDF Full Text Request
Period to the manufacturers for the construction of the railway line, can enhance of ji-tong railway freight system function, give full play to the channel capacity, the project will improve the level of set tong line more than 30% of the traffic. Can improve the stake of coals channel capacity, improve the composition of JiNing regional rail network, to promote energy conservation and environmental protection. Can improve the regional road network structure, enhance the flexibility of transportation, alleviate the pressure of the JiNing region of railway transportation, form a set of general line and the link between the coal channel, enhance the maneuverability of regional road network. Benefit along the economic development, social progress and achieve various national common prosperity, strengthen the national unity. Period to manufacturers, therefore, the construction of the railway line is very necessary. Period to manufacturers, however, the construction of the railway line, is very complex, construction scheme involves the transportation organization, the construction quantity, engineering cost and operating expenses of the forward, how to choose the best scheme for implementation, is the most important aspect of the early stage of the project.Based on fully understand the check data, survey, on the basis of the period are line layout scheme for carry out the research of evaluation. This paper analysis the period to the seller, railway line and area, including economic and traffic volume, economic characteristic, network structure, the annual passenger and cargo traffic volume forecast, the vision of transport capacity and transport organization in the station distribution, transportation organization mode and the mode of operation management, traffic organization, traffic volume and the station workload, capacity and transmission capacity, management organization setup, jurisdiction, transport capacity, scheduling area division, driving device, etc., and established the design thinking, design alternatives. Based on analytic hierarchy process of fuzzy comprehensive evaluation method, to establish a period to agent railway arrangement scheme appraisal system, establish the index weight, finally using the established evaluation index system, to be chosen standard solution, local scheme selected reasonable plan II was evaluated, I and the local comprehensive evaluation for the standard scheme selection are connected, the CK0 + 000(manufacturers stand) ~ CK48 + 100 solution in use, for CK17 + 200 ~ K56 + 600 section optimization of I, integrated assessment results more reasonable and proves the rationality of the evaluation index system.
Keywords/Search Tags:railway line, Layout plan, evaluation
PDF Full Text Request
Related items