project is feasible, the future factory site conform to the requirement of theenvironmental protection. After it is completed, it will improve the water quality ofthe Hanchuan basin distinctly, and it conforms to the water environment functionrequirement. So long as the construction unit strictly carries out the pollutionpreventing and controlling measure which this paper proposed, and reduces theenvironmental effect of the project to the threshold, from the environmental protectionangle, the construction of the project is feasible.
|