| In the course of the production in mine, the production plan of mine is of great importance. So how to realize the draft of mine production is becoming a more and more significant problem.This article applies the fuzzy similar prior matrix theory and "Haming distance", establishes the classified model on working face. By the reliability analysis of the production process about working face, the associative analysis of length and advance extent .the result aroused by economic mathematical model of the length of working face and the simulation on the working face parameters. The optimal production aim is decided by the model of demand forecast and the storage theory. In the context of the fixed production plan, by means of Auto CAD, Visual 6.0, the universal model about the succession plan about mine exploitation is formed. At last , through the bit method in order to ensure the succeeding plan of best working face. So the maximal economic benefit during the planned period is realized. |