Font Size: a A A

High Reliability Study And Realization Of Flexible Transit System In Cigarette Finished Products

Posted on:2004-06-19Degree:MasterType:Thesis
Country:ChinaCandidate:Q C YangFull Text:PDF
GTID:2121360122970561Subject:Mechanical engineering
Abstract/Summary:PDF Full Text Request
With social science and technology developing, the automatization and informatization have already exerted in manufacturing comprehensively. The text introduced the basic condition of red-tower manufacturing workshop material flow system and analyzed the problem that the present operating workshop material flow system exists in. According to the analysis of the basic constitutes and running pattern of the cigarette finished products manufacturing workshop material flow system, it carried through anatomy of the several problems that the cigarette finished products flexible material flow system existed in on running .It mainly researched the reason that the cigarette finished products appeared dilapidation in the process that was loaded by AGV, portaged and deposited by Stack Crane. Secondly, it also carried through the statistic of the damaged data of the cigarette finished products for a period of time (half year), analyzed the economy losing that it caused. Finally, it brought forward that the basic method of enhancing the system's reliability, the assignment of every phase in the process of the task putting into effect and the collectivity perfecting the cigarette finished products flexible material flow system in order to enhance its reliability.The text mainly achieved the realization of the highly reliability of AGV and feeding machine system. It made the rate of the cigarette finished products overturn descend from the primary 2.22‰ to 0.097‰. It saved capital about 150,000$ for enterprise every year, at the same time, it effectively receded the feasibility of the damaged finished product inflowing market, gained favorable society benefit and economy benefit. There is some advantage significance for bed-tower fitting the increasingly drastic market competition better and better.
Keywords/Search Tags:workshop material flow system, flexible material flow system, loaded by AGV, Stack Crane
PDF Full Text Request
Related items