Font Size: a A A

Early age performance of latex-modified concrete bridge deck overlays

Posted on:1998-06-21Degree:Ph.DType:Dissertation
University:Oregon State UniversityCandidate:Sujjavanich, SuvimolFull Text:PDF
GTID:1462390014477602Subject:Engineering
Abstract/Summary:
Environmental factors and physical properties of latex modified concrete (LMC) are hypothesized to contribute to early age cracking in bridge deck overlays. Cracking permits the ingress of moisture and aggressive solutions into the substrate and may contribute to other subsequent distresses. Understanding the material properties and mechanisms involved is necessary to minimize these distresses.; This research consisted of a two part study: first, the development of LMC strength and fracture properties at ages ranging from 5 hours to 28 days was studied, and secondly, the effects of the environment on LMC distresses were modelled. Environmental conditions: temperature, solar energy, and wind speed were determined from weather records. A fracture mechanics based model, the Fictitious Crack Model (FCM), incorporating finite element analyses and superposition techniques was employed with material properties from the first part of study on LMC performance. Different bilinear strain softening diagrams were used to predict fracture performance at different ages. The predictions agreed well with the test data. The impacts of temperature differentials on crack development were studied. The shrinkage effect was also indirectly incorporated through the temperature analysis.; The material properties study indicated significant changes in strength, deformability and fracture properties, particularly during the early age. The developments differ slightly from conventional concrete. Test results indicated a significant improvement in reducing and bridging microcracks, especially in the prepeak-load region. Fracture toughness and deformability increased significantly with time. Fracture energy varied from 2.3 to 133.1 N/m, depending on age, and to some degree, on notch depth ratio.; In the second stage, the FCM provided a reasonable prediction for crack initiation and propagation when only temperature effects are of concern. Age, surface conditions and structural restraint strongly affect crack resistance of the overlays. Only slight effects were observed from the overlay thickness in the study range (51-76mm). Shallow pre-existing cracks possibly reduce the crack resistance of the overlay about 30 percent. A prolonged moist cure for 48 hours after placing is suggested to reduce the risk of cracking. With available environmental information, it is possible to develop guidelines for appropriate environmental conditions for LMC bridge deck construction to minimize the risk of early age cracking.
Keywords/Search Tags:Early age, Bridge deck, LMC, Crack, Concrete, Environmental, Performance
Related items