Full scale calcium bromide injection with subsequent mercury oxidation and removal within wet flue gas desulphurization system: Experience at a 700 MW coal-fired power facility

Posted on:2013-02-26Degree:Ph.DType:Dissertation
University:The University of Alabama at BirminghamCandidate:Berry, Mark SimpsonFull Text:PDF
GTID:1451390008478609Subject:Chemistry
Abstract/Summary:PDF Full Text Request
he Environmental Protection Agency promulgated the Mercury and Air Toxics Standards rule, which requires that existing power plants reduce mercury emissions to meet an emission rate of 1.2 lb/TBtu on a 30-day rolling average and that new plants meet a 0.0002 lb/GWHr emission rate. This translates to mercury removals greater than 90% for existing units and greater than 99% for new units. Current state-of-the-art technology for the control of mercury emissions uses activated carbon injected upstream of a fabric filter, a costly proposition. For example, a fabric filter, if not already available, would require a ;This research consisted of investigating calcium bromide addition onto PRB coal as a method of increasing flue gas halogen concentration. The treated coal was combusted in a 700 MW boiler and the subsequent treated flue gas was introduced into a wet FGD. Short-term parametric and an 83-day longer-term tests were completed to determine the ability of calcium bromine to oxidize mercury and to study the removal of the mercury in a wet FGD. The research goal was to show that calcium bromine addition to PRB coal was a viable approach for meeting the Mercury and Air Toxics Standards rule for existing boilers.;The use of calcium bromide injection as an alternative to activated carbon approaches could save millions of dollars. The technology application described herein has the potential to reduce compliance cost by...
Keywords/Search Tags:Mercury, Calcium bromide, Flue gas, Wet, Coal
PDF Full Text Request
Related items