This article introduces the principle of DEB and features of its function blocks .The article studies the difference, advantages and disadvantages of Co-Ordination Control Strategy under the Direct Energy Balance and Indirect Energy Balance. It introduces the configuration and way of MAX1000+PLUS Distributed Control System, studies the characteristics and its influence to the operation of Coordination Control of the subsystems of Mill, Primary Air fan etc. deeply and Systematically. The article analyses in detail the putting into operation by DEB Coordination Control and also the key points by AGC operating under this way, Obtained the Dynamic characteristics of the unit via site real time test on the unit. It developed a New method of Co-ordination Control System and AGC putting into operation for Large size coal fired power plant.
|