Font Size: a A A

Research On The Whole-process Management Of The Social Security Prevention And Control System Project In City A

Posted on:2024-06-03Degree:MasterType:Thesis
Country:ChinaCandidate:S GuanFull Text:PDF
GTID:2556307091975399Subject:(professional degree in business administration)
Abstract/Summary:PDF Full Text Request
The economic and social transforming and upgrading is continuously promoted by the development of information technology.While further improving the quality of people’s living standards,it has also brought many new challenges and problems to social governance.At present,the methods of illegal crimes are becoming more hidden,diversified,and technologically advanced.More offline crime forms are showing the trend of shifting to online,and the risks and hidden dangers faced by social security prevention and control have also changed and increased.Facing the new situation of my country’s social security governance,the original security prevention and control methods need to keep pace with the times,update iterations,transform and upgrade in various links such as preventing risks,resolving conflicts,and defusing hidden dangers.Facing the new requirements of the new era,public security at all levels across the country has faced up to the difficulties,and proposed to help police process reengineering and reshape the quality of work through informatization and intelligent construction,so as to systematically lead a new generation of informatization and intelligent prevention and control system Construction is imperative,and the city A public security prevention and control system project came into being under such a background.Improving the performance of the social security prevention and control system is a fundamental project to promote the modernization of social governance and build a higher level of safe society.In the specific construction process of each locality,the cooperation of various departments under the unified leadership of the party committee and the government,and the public security organs,as the main force for maintaining social security and stability,lead the construction projects of the social security prevention and control system.Referring to the past experience in the construction of social security prevention and control systems,due to the large business volume of the prevention and control system itself,the large number of social resources involved,and the high complexity of project construction,no matter from intensive construction or from the ultimate goal of breaking business data islands and maximizing the effectiveness of all parties On the one hand,on the basis of step-by-step construction,a high degree of overall planning is urgently needed,and the construction of a system platform corresponding to a high degree of specialization in project engineering is difficult.Therefore,project management methods that are scientifically adapted to the entire process are required to ensure the construction progress of projects.The implementation of pertinent and scientific and reasonable project management requires a comprehensive and thorough research on the whole process of project management.This article starts from the reality of the construction of the social security prevention and control system in city A,takes the whole process project management as the entry point,and integrates the three core elements of planning management,implementation management,and evaluation management(schedule management,quality management)in the project management process.Using questionnaire survey,interview survey,case tracking,literature survey and other research methods,to extract the impact indicators on the whole process management of the social security prevention and control system construction project in city A.The analytic hierarchy processing is adopted to determine the impact of each impact index weight,ensuring a more accurate evaluation of the social security prevention and control system construction project in city A.Finally,according to the evaluation results,the whole process management implementation plan of the social security prevention and control system construction project in city A is proposed,and countermeasures are put forward for the factors affecting the whole process management,so as to provide reference for the construction of the social security prevention and control system in city A.
Keywords/Search Tags:public administration, social security, project management, whole-process management
PDF Full Text Request
Related items