Font Size: a A A

ZT Second Bureau Construction Project Safety Assessment And Optimization Strategy Research

Posted on:2022-10-17Degree:MasterType:Thesis
Country:ChinaCandidate:C B DengFull Text:PDF
GTID:2511306524957539Subject:Business Administration
Abstract/Summary:PDF Full Text Request
In the early stage,this paper collected a large number of related theoretical research results of this topic,understood the current status of current construction project safety management research,combed the existing conclusions and viewpoints after overall deliberation,took ZT construction project safety management as an example,carried out field investigations to understand the construction projects of ZT Second Bureau Existing problems in construction project management,carry out theoretical and practical analysis,and comprehensively combine key analysis methods.From project bidding,contracting,construction preparation,construction process to completion and settlement of the whole process cycle,how to do well in construction safety project management,and how to do The best combination of safety management elements.Grasp the status quo of safety management of construction projects of ZT Second Bureau,analyze the PDCA cycle management mode of ZT Second Bureau,launch a questionnaire survey on construction safety issues,apply the results to safety assessment,and combine the basic characteristics of the construction industry to introduce personal opinions.The main problems and influencing factors of construction project safety management.Regarding the lack of safety expertise in the construction projects of the ZT Second Bureau,poor safety awareness,material safety and quality problems,the aging of construction machinery and equipment,and the unclear division of project management safety responsibilities,the ZT Second Bureau should improve the work of the project leadership.Division of labor,strengthening effective communication between superiors and subordinates,enhancing the independent decision-making of management,adjusting the assessment rules of the project department for safety management,and achieving optimization of construction project management in the above aspects.In the end,combined with the construction project examples of the ZT Second Bureau,the construction project has strengthened the management of elements,contracts,information,and on-site management,as well as the analysis and evaluation of the organization and coordination,and the operation mechanism,making the ZT Second Bureau's construction project management truly standardized and benign The circular road also provides references for similar engineering practices.
Keywords/Search Tags:ZT Second Bureau, construction project, safety assessment, optimization, safety management
PDF Full Text Request
Related items