Font Size: a A A

Project Financing Analysis And Model Selection Of P Company In The South Of New District

Posted on:2017-08-05Degree:MasterType:Thesis
Country:ChinaCandidate:X M YangFull Text:PDF
GTID:2429330596956613Subject:Business Administration
Abstract/Summary:PDF Full Text Request
Since the reform and opening up,along with the increase of economic strength,China's transportation infrastructure construction has made great progress.According to statistics by the end of 2015,the Ministry of transport announced that "the national fixed asset investment over 12 trillion and 500 billion 12 th Five-Year" period.However,the financing problem has been a bottleneck to hinder the development of our enterprises,especially the building enterprise capital intensive.In recent years,the economy of our country in the period of the development of the "new normal",increasing downward pressure on the economy,original narrowed the financing channels,financing threshold is getting higher and higher,which gives originally difficult financing problem more add a lot of trouble.In this paper,P company in the south of the new ecological engineering,for example,hope that through this typical case,find a new way to solve the problem of financing.First,the P company operating environment and southern Ecological District background were detailed analysis,then focuses on the analysis of P company's current financing situation,mainly including the financing problems and causes of these problems.The existence of the financing problems of capital structure is unreasonable,the mode of financing and financing channels for a single,high capital costs and capital demand is expected and the use of funds is not reasonable,etc..The causes of these problems are micro factors and two aspects of the macro environment.The macro environment,mainly the lack of strong policy support and improve the financial environment;micro factors mainly embarks from the P company itself,analyzed the P company some short board,including the particularity of the unit nature and the lack of financial knowledge and perfect enterprise management system.Then,the project is divided into four stages,respectively is the start stage,road construction stage,overall construction stage and closure phases,and according to each stage of the capital requirements and characteristics of financing,to develop a suitable for the specific needs of the financing mode.Finally,the financing,financing cost and feasibility of the three weights,by the three factors of different score and choose the most suitable financing mode,and puts forward a series of improvement measures aiming at the problems of P company.
Keywords/Search Tags:financing mode, internal financing, external financing, project life cycle, financing cost
PDF Full Text Request
Related items