Research On Financial Risk Assessment And Control Of BZS Wind Power Project

Posted on:2019-01-20Degree:MasterType:Thesis
Country:ChinaCandidate:W TanFull Text:PDF
GTID:2392330602960569Subject:Accounting
Abstract/Summary:PDF Full Text Request
With the rapid development of society and economy,demand for all kinds of energy is becoming more and more.In the case of serious environmental damage,the status of clean energy is increasing rapidly.The state has more and more support for clean energy,and wind power generation is one of them.Wind energyy is renewable and pollution-free,and according to the World Meteorological Organization,the total amount of wind energy in the world can reach 130 billion W,which is more than 10 times more than the total amount of water energy that can be exploited and used in the world.Wind power not only protects the environment,but also saves other non renewable resources.In the context of energy conservation and environmental protection,the construction of wind power stations in China is more and more.However,the general construction period of the wind power generation project is long,it needs a strong capital background,and the technical requirements for the construction and installation and design are very high,Tllerefore,there are a lot of factors hindering the normal operation of the project from the beginning of the project to the completion of the project.Some will slow down the construction progress of the project,reduce the quality of the construction,and even more.A person may cause a major safety hazard or financial loss.In this case,the project manager's risk assessment and control of the project is very important.According to the actual situation of the project,the risk of the project can be identified,the risk is analyzed qualitatively and quantitatively,and the effective countermeasures to deal with the risk are put forward so as to achieve the effective control of the item risk and reduce the project.This is a higher income.This paper applies the theory of financial management to wind power projects.Through consulting a large number of literatures on risk management and control of engineering projects and combining with the real case of BZS wind power project,the paper first identifies and classifies the financial risks of the projects by combining Delphi method with brainstorming method.Then,according to the characteristics of BZS wind power project,five key financial indicators are selected from the perspective of profitability and solvency to calculate the financial risk score,and the financial risk of the project is quantitatively analyzed.The conclusion that the project has a small risk is drawn,but according to the financial situation.The index data show that the risk of project cost is relatively large.Subsequently,the paper establishes a financial early warning system by using the Wall method to provide the early warning evaluation method of financial risk for the project,so that the project can better avoid risks.Finally,according to the conclusion of financial evaluation,the paper puts forward relevant measures and suggestions from the internal and external aspects of the project financial risk control,in order to achieve the effective control of the financial risk of BZS wind power project.
Keywords/Search Tags:Wind power station, Financial risk, Risk control and management, Analytic hierarchy process
PDF Full Text Request
Related items