Research On Risk Management Of BOT Project In Yinbai Toll Highway

Posted on:2020-04-29Degree:MasterType:Thesis
Country:ChinaCandidate:M WangFull Text:PDF
GTID:2392330590464492Subject:Project management
Abstract/Summary:PDF Full Text Request
The investment and construction of toll roads in China is constantly advancing.In the construction of toll roads,a new financing model that is popular with the public is emerging.The emergence of this financing model has greatly expanded the entire financing channel and provided assistance for the shortage of funds in the construction of toll roads.With the continuous development of the market economy,how to maximize the economic benefits of this financing model and how to avoid various risks in actual financing activities are issues of great concern to the entire industry and local governments.Based on this,it is of certain significance to select the risk management of BOT projects on toll roads as a research topic.In order to explore how to reduce the risk of the Yinbai Toll Road construction project under the BOT model,and to effectively ensure the completion of the final project objectives,give full play to the role of the BOT model.Firstly,the research background,significance,ideas and methods are expounded,and the project risk management and BOT project risk related content are studied.Secondly,carry out risk identification of BOT project on Yinbai Toll Road.The identification of each risk factor in the B100 project of Yinbai Toll Road involves risks such as market risk,financial risk,natural environmental risk,policy risk and completion risk,operational risk and cost overrun risk in internal risk.Then,using the analytic hierarchy process,the overall project risk is identified and evaluated,and each risk is initially sorted.According to the total weighting result of the chromatographic analysis method,the market risk occupies the largest weight ratio and the risk is higher.On this basis,the ideas and principles of the entire project risk resolution are clarified.In the actual risk incidence rate and different weight rankings,specific solutions are developed for different risks,and then the risks are effectively managed to achieve the expected projects.aims.At the end of the article,the conclusions of the full text are summarized,and the defects of the existing research are found,and the future research is planned.Through the specific analysis of the toll road BOT Yinbai project,the risk factors of the Baitong toll road BOT project are studied,and specific risk solutions are proposed for the participants of the project,and the risk management response strategy is proposed,which isbeneficial to Yinbai.The participating parties of the toll road BOT project will cooperate in the later stage,and provide some risk management experience for the current BOT project risk management in different industries.
Keywords/Search Tags:BOT project, toll road construction, analytic hierarchy process, risk management
PDF Full Text Request
Related items