Study On Construction Cost Management Of Wuhan High-speed Railway Training Section

Posted on:2018-04-10Degree:MasterType:Thesis
Country:ChinaCandidate:R YinFull Text:PDF
GTID:2382330566955813Subject:Project management
Abstract/Summary:PDF Full Text Request
At present,the railway construction projects are generally rough design,duration of compression,change lag,settlement delay and other status quo,coupled with today's artificial,mechanical,materials and other direct costs soaring,and the railway bidding to expand the competition,are directly or indirectly To reduce the profits of railway construction enterprises,squeezing the survival of railway construction enterprises.In particular,there are still many traditional railway construction enterprises from the planned economy in the old concept of change over,ignoring the construction cost control and management,so the project losses caused by the example is not uncommon.Wuhan high-speed rail training section of the project is the author of a railway construction enterprises suffered a serious loss of the project.In this paper,the author through the Wuhan high-speed rail training section of the first phase of the project,standing in the construction management unit point of view,the construction enterprise construction cost management in a series of problems in-depth investigation and research to find the construction enterprises in Wuhan high-speed rail training This paper puts forward some suggestions for strengthening the construction cost management for the railway construction enterprises,hoping to help the investment management of the construction management unit of the Wuhan high-speed rail training section and the construction cost management of the construction enterprise.
Keywords/Search Tags:investment control, cost management, analysis, advice
PDF Full Text Request
Related items