Research On Budget And Settlement Management Of Large Construction Group Project

Posted on:2018-01-24Degree:MasterType:Thesis
Country:ChinaCandidate:Y ZhangFull Text:PDF
GTID:2382330545474905Subject:Engineering
Abstract/Summary:PDF Full Text Request
With the deepening of China's reform and opening up,the acceleration of urbanization process,there are large numbers of construction groups appeared in the market,and the competition between them are enterprises.Most of the construction groups' pre-settlement management systems are not perfect,the rights and responsibilities boundaries are not clear and other issues become more obvious.Causing that when some construction groups face into the economic downturn,the profits will be significantly reduced.Construction groups' pre-settlement management involves more functional departments,longer construction period.The need for multi-sectorial participation,works together.Construction of the various stages of the cost control needs a comprehensive control,in order to ultimately improve the construction efficiency and maximize the benefits.First of all,this paper starts from the domestic and foreign pre-settlement management research literature,and set up through the five construction groups cost management related institutions,responsibilities,summed up the common management mode of operation.This paper analyzes the current situation of the existing pre-settlement management of the construction groups,and discusses the problems such as the common problems or the pre-settlement management system.The questionnaire survey method and the expert consultation method are used to deal with the management system of the pre-settlement management system and the cost management part.In the end it pointed out that there are some problems such as lack of clear division of responsibilities,imperfect contract management,imperfect management system and unproductive platform of pre-settlement management.Then,according to the cost management characteristics of the construction group,the paper will construct the pre-settlement management mode from the aspects of the pre-settlement management system,the organizational framework,the management process and the related system.The construction group pre-settlement management agencies set up a detailed description of the various functional departments between the responsibilities,rights,interests of the division,and the project settlement audit process refinement.And then according to the previous study which have been pointed out,the pre-settlement management of common problems.And according to the details of the pre-settlement audit measures,including the scope of the project,the amount of engineering,fixed costs,fees charged four aspects.In addition to strengthening the project change management,to improve the cost of deviation management measures.Finally,according to the literature research,investigation and analysis.Conduct empirical research with the electromechanical building project.First of all,describe the project,and then according to the construction of the pre-settlement management model,respectively,the pre-settlement management system,the organizational framework,the management processes,the related systems and other aspects of elaboration.Theory and practice after the combination of proof of the construction of the pre-settlement management model of the scientific and feasible to promote the development of pre-settlement management.
Keywords/Search Tags:pre-settlement management, construction group, the whole process cost, change management
PDF Full Text Request
Related items