Font Size: a A A

Study On Operation Risk Management Of Foreign-related LNG Project Undertaken By The Offshore Oil Engineering Company

Posted on:2018-09-04Degree:MasterType:Thesis
Country:ChinaCandidate:W JiangFull Text:PDF
GTID:2359330515469067Subject:Business administration
Abstract/Summary:PDF Full Text Request
A planing of national marine main functional area is recently issued by the State Council,which proposes to increase the development ability of marine resources and implement marine powerful nation.As a high-input,high-tech and high-risk industry,the construction of offshore oil engineering is intersected and restricted by many factors.Failure to keep away from these factors will result in project property loss at least and life and ecosystem disasters at worst.As the marine energy source development of China occupies more and more shares in global market,the risk control of the project also becomes more and more important.On the basis of setting up the research background and research meaning as well as analyzing the current situation of domestic research,the paper brings in related concepts on offshore oil engineering and focuses on analyzing the difference between the foreign-related offshore oil engineering and domestic project.It also make relevant introduction to the generally adopted management model on current foreign-related offshore oil engineering.Meanwhile,it borrows on the theoretical knowledge to introduce the classic method and procedure of rick identification and risk control.By taking a large-scale foreign-related LNG project as the case and applying specific risk factor identification,risk assessment and risk control,the paper establishes a risk control table during the project bidding,implementation and completion phases.Finally,it focuses on introducing the adopted measures and achieved effects on procurement risk control of the foreign-related LNG project by combing the project characteristics from the perspective of purchasing administrative staffs.By comprehensively analyzing the construction characteristics of foreign-related project,the paper puts forward the problems encountered in this kind of projects.Thus it summarizes the necessity of project management risk control.Meanwhile,in the purchasing management aspect of foreign-related offshore oil engineering project,it also puts forward some innovative viewpoints which have a certain referential meaning on how to enhance the purchasing ability in the future foreign-related project.
Keywords/Search Tags:foreign-related project, risk discrimination and control, risk management of projects
PDF Full Text Request
Related items