Font Size: a A A

Study On The Risk Management Of Direct Selling Elecyrucity Project Of Nanning Power Plant

Posted on:2017-12-09Degree:MasterType:Thesis
Country:ChinaCandidate:J L WangFull Text:PDF
GTID:2359330512970561Subject:Engineering
Abstract/Summary:PDF Full Text Request
This paper is based on the current electricity market reform,the project management risk research as the theoretical basis,with the state power Nanning power plant project as the research object,the feasibility of the establishment of direct selling electricity project.The study found that although the "electricity reform No.9 and reform policy to determine the sale of electricity reform,clear the basic access conditions,the sale of electricity market operation principles and methods,and has gradually carry out the pilot,a positive response to the national electricity reform policy,to participate in the placing of electricity reform,not only to solve the current economic situation in Nanning power utilization hours low situation,and can provide power and electricity to the industrial park management integration services,allow enterprises to share the benefits of electricity reform.But the initial stage of reform in the cost,policy,system and market environment,there is still a big risk.Through the control of risk analysis,to participate in the sale of electricity side market development,distribution and sale of electricity and related business,can realize the power generation business development,adding new profit point,but also enhance the sustainable development of the local economy,has far-reaching strategic significance to promote the sustainable development of local economy.The formation of the park the sale of electricity companies,electricity reform not only conforms to the spirit of the document,but also has the advantages of location and resources,large enterprises(electric Deyuan metallurgy,Yong Kai paper,paper and power generation enterprises(Jin Daxin)in Nanning power plant),with the distribution network and new enterprises in the new network,and lay the foundation for future development of power distribution business.
Keywords/Search Tags:Nanning power plant, electricity reform, direct selling electricity, risk management
PDF Full Text Request
Related items