Font Size: a A A

Analysis Of The Operational Risk Of The Intelligent Community

Posted on:2019-01-08Degree:MasterType:Thesis
Country:ChinaCandidate:B L YangFull Text:PDF
GTID:2346330548462244Subject:Management Science and Engineering
Abstract/Summary:PDF Full Text Request
Since IBM proposed the intelligent of the Earth concept,many countries and regions in the world have been gradually put into "intelligent" in the construction of our country,also in the "13th Five-Year" plan clearly put forward the intelligent of the city as an important strategic direction of new urbanization in the future.Smart community,as a major part of building smart city,is the contact point of urban intelligence,and is the carrier of urban governance,community service and market promotion.As a new generation of information technology driven community type,smart community is the inevitable trend of the future community construction and development.It is also an important way to innovate community service mode and change the way of community governance.In the course of the transformation from the traditional community to the intelligent community,the construction of our country’s intelligent community faces new opportunities and challenges.Although our government organizations,enterprises and research scholars have realized the strategic significance of smart community construction,there is still a lack of systematic understanding of the risks faced by smart communities in the operation process.At present,the research on the risk of smart community project operation is relatively weak,which is hard to meet the systematic,comprehensive and structural requirements of project risk management.Therefore,to systematically identify and analyze risk factors of community intelligence operations in the process of selecting a suitable method of risk analysis,to calmly deal with the intelligent community building boom,improve the intelligence community theory system,has important meaning to improve the operation level of the intelligent community.The intelligent community operation risk management need to solve the first problem is how to carry out the systematic identification and analysis of project risk,and the existing literature and the lack of research,according to the intelligent community operation risk therefore,the choice of intelligence community projects operation risk analysis and research:The three-dimensional structure model of the operational risk of the intelligent community is put forward.The model of the intelligence community projects operational risk into a risk identification system,the main factors from the time dimension,target dimension analysis between community peacekeeping operation risk inherent intelligent and influence,preliminary identification and summarizes the risk factors of community operation risk intelligent induction table,the operation risk of The intelligent community for the project environment division risk,project risk and operational risk in the main system,and summarizes the management of operational risk in the process of community intelligent based on 3D model.Based on the preliminary identification of operational risk of smart community by threedimensional structure model,this paper mainly makes further analysis and evaluation of operation system risk in smart community operation risk.First,flow diagram of system dynamics theory to construct the community operation risk of intelligent causality diagram and operation system based on risk,and uses system dynamics simulation software vensim to simulate the operation of the system risk,predict the variation trend of system risk and operational risk of information security risk project intelligence community values,and to determine the dominant factor in operating system risk and risk control point: in the intelligent community operation system risk,the risk of operating system user value influence degree is the largest,followed by the software system risk,the influence of hardware system risk;risk management system of the intelligence community in the operation of the project 8 years later ushered in an outbreak of this.It requires the intelligent community management in the operation of the project eighth years need to conduct a large-scale investigation of risk factors,so as to ensure the normal operation of the intelligent community.
Keywords/Search Tags:Intelligent Community, Operational Risk, Risk Identification, Risk Analysis, System Dynamics Simulation
PDF Full Text Request
Related items