Baotou Donghe District G6 Highway Ecological Comprehensive Control Of Water Supply Pipe Network Project Construction Cost Control And Risk Management Research

Posted on:2019-04-03Degree:MasterType:Thesis
Country:ChinaCandidate:L HaoFull Text:PDF
GTID:2322330569488563Subject:Architecture and civil engineering
Abstract/Summary:PDF Full Text Request
Beijing-tibet expressway from the capital,an important part of the contact in the western region.Highway construction must in the mountains,across the river.The water and soil along the highway.Vegetation to a certain extent influence along the highway,the environmental protection problem has already become the important factors that must be considered in the construction of highway engineering.Based on the baotou city donghe district G6 highway ecological comprehensive control of water supply pipe network project cost control related problems are studied.(1)based on the current situation of government investment project cost control in our country,and more and more on the government investment projects and investment amount rise,put forward the improvement of the cost management problem is urgently needed to solve the problem,and further study of the cost management of government investment project is very necessary.(2)based on the study of baotou city donghe district G6 highway ecological comprehensive control of water supply pipe network project cost control,standing in the Angle at the owner,in order to realize effective control of engineering cost for the government investment projects for the purpose of the social and economic benefits of value-added,based on the quantities bill valuation with the project cost control theory,put forward the bill of quantities valuation mode of construction cost control points.In the bidding stage,should focus on the tender documents,bill of quantities,pre-tender estimate,bid evaluation and contract related analysis,to control the engineering cost control;In construction stage,to pay claims,on-site visa,progress payment and project settlement etc.This paper discusses and puts forward the measures on how to avoid risk,control cost.(3)suggest actively push the PPP mode,namely the government and social capital together for public infrastructure construction,and maximize the use of the resources of the department of social capital,the government departments of the middle of project operation and management involved in deeper,to save money,improve the probability of the project completed on schedule,the purpose of control the budget.Through the above analysis,the baotou city donghe district G6 highway ecological comprehensive control of water supply pipe network project cost can be controlled in a reasonable range of the preliminary conclusion.
Keywords/Search Tags:Water supply pipe network project, Cost control, Risk management, PPP
PDF Full Text Request
Related items