With the development of deep-sea fundamental technology and machinery,all kinds of confferdam are being used more frequently.As one of mostly seem cofferdam technology,the traditional way is to made a physical analysis of all the parts,and based on each part of the structure to unit as one whole cofferdam.To simplify the model and to consume with care,the outcomes may not meet the need of the project in full use of materials and even result in safety issues.This is why making a whole analysis of the cofferdam is of significant meanings.This paper is mainly based on the actual use of the cofferdam in Fushuntuo river bridge.It contained the choose of the cofferdam as well as the whole process of the cofferdam procedure.With the use of MIDAS to establish the whole structure,the simulation of all kinds of pressure,it in some ways formulate the real-time sitation of the project.It contains the analysis of all features and the comparison with the real data.To supply for the real project,an entire physical analysis is made during this paper.The result shows that this is significant meaning in doing maths within these cofferdam structure affairs. |