| In order to implement the spirit of the party’s eighteen,according to the spirit of general secretary Xi Jinping eighteen series of important speech,focus on the development of the new concept of innovation,harmony,green,open,sharing,adhere to reform and innovation as an important starting point,to enhance the quality and promote the supply side as an important measure of the reform of the structure node.2015 Quality Month activities theme "towards quality times,building quality power";2016 quality month,the state raised the "quality of supply,building quality power" theme of activities.In the context of the rapid development of market economy,there are some quality problems and risks of the construction enterprise project,as the construction industry plays an important role in the development of the market economy,the healthy development of the relationship between economic development,related to people’s quality of life,related to social stability.Further strengthen quality management,innovation in building new methods,new thinking,put forward feasible modern quality management methods.This paper analyzes the construction quality of the domestic and foreign research on the implementation of quality engineering,expounds the research background and significance,through the study of construction quality control at home and abroad,combined with the current situation of China Construction and the existing problems,and puts forward the research content and research methods of this paper.This combination of Wuhan coastal construction quality control of Los Angeles project content for the study,first of all,the quality of building engineering theory in detail,then lists the quality control of the key content,Wuhan coastal Sailuocheng project.Secondly,study the method of Wuhan coastal Sailuocheng quality control,how to carry out before,during and after the three stages the quality control,the quality control in PDCA cycle interspersed among them,using statistics method,analysis method of engineering quality analysis of the quality of causal analysis.At the end of the Wuhan coastal Sailuocheng project quality control results are summarized and discussed Follow-Up Services.Wuhan coastal Sailuocheng project quality control in some areas have achieved certain results,worthy of promotion in the field of engineering. |