Font Size: a A A

Application Of Value Engineering Scheme Comparison Method Of Foundation Design Stage

Posted on:2018-11-01Degree:MasterType:Thesis
Country:ChinaCandidate:Q WuFull Text:PDF
GTID:2322330536459780Subject:Project management
Abstract/Summary:PDF Full Text Request
The design and construction stage are important period,when a breakdown or a plurality of engineering implementation plan,difficult,in this paper,the application of value engineering method for the engineering design phase of the program must provide effective method,therefore,no matter in the design or implementation stage construction stage,the application of value engineering the theory to improve project quality,reduce project cost has a great help.Value engineering is a kind of new economic and technical analysis method,has been widely used in the construction engineering design and construction,value engineering research is based on the necessary function,how to reduce the cost of the object,the object structure is more reasonable,and not simply the pursuit of complete function or the lowest cost;value engineering a mature technology and economic thought and management measures;how to use value engineering and how to use value engineering has greatly help to improve the economic efficiency of enterprises.In recent years,with the continuous progress of urban construction in China,in the construction,water conservancy,bridges,transportation and other fields encountered more and more bad foundation to ensure that the value of the project in the foundation design stage of the application value The foundation of the foundation is the foundation of the whole building.There are many kinds of foundation treatment methods,such as: CFG pile,Vibroflotation stone pile,cement soil mixing pile,etc.,how to choose the most reasonable method of foundation treatment to determine the construction plan This paper draws on the success stories of applied value engineering in industrial production projects,plans the application of value engineering to analyze the design of the foundation treatment of the project,how to improve the value of the building as a whole,mainly through the value analysis to make the building The function and cost of the matching,to play the investment benefits,so as to project management personnel to provide a reference for engineering decision-making.It is true that the foundation treatment is only the tip of the iceberg for the whole project.The purpose of this paper is to propose a method to choose a reasonable design scheme,and to draw out the success stories of the foundation treatment as an analysis.The purpose is to illustrate the value engineering in various fields of construction engineering,All stages can be widely developed.
Keywords/Search Tags:Value engineering, Foundation treatment, CFG pile, Vibrodite gravel pile, Cement soil mixing pile
PDF Full Text Request
Related items