Font Size: a A A

Analysis On The Construction Organization Scheme Of Sea Reclamation Project Of Caofeidian

Posted on:2018-04-28Degree:MasterType:Thesis
Country:ChinaCandidate:J S ZhangFull Text:PDF
GTID:2322330533470910Subject:Architecture and civil engineering
Abstract/Summary:PDF Full Text Request
With the development and construction of Caofeidian Industrial Zone,the demand of the land area has become bigger and bigger.With the starting of the reclamation project,more and more new problems encountered in the construction.Taking a case of land reclamation in Caofeidian area for example,on the basis of engineering field conditions of Caofeidian Development Zone and the construction work environment and the corresponding construction plan,the author does some targeted researches on a series of important steps in coastal areas of the Caofeidian Development Zone land reclamation and reclamation of design and construction,including how to use different construction schemes under the different geological conditions and natural conditions,especially studying the dike construction in each step and the critical point of closure dike.Through the brief analysis of closure failure,the research highlight the importance of process control.Under the guidance of the successful experience,the author adopts the bamboo raft-frame filling pipeline after the increase of the late fill sand silt content,which provides a new method to fill bank pipe laying.This paper briefly introduces the influence of the selection of the filling scheme on the filling effect.Through the discussion,it is clear that only the detailed study of the natural geographical conditions of the construction area can make feasible and efficient overall construction scheme.The key point and difficulties,such as dike closure,ship selection,Longkou silt under the condition of filling pipeline connection scheme and reclamation scheme selection,directly affect the speed and the economic benefits of the project.
Keywords/Search Tags:construction scheme, reclamation activities, blow fill construction
PDF Full Text Request
Related items