| Semi-submersible drilling platform for Mechanical Completion (MC) is the installation work according to the provisions of the construction contract and the requirements of the proect specifications for the completion status of validation,different projects will provide owners with the relevant consultations with different software systems form confirmation of completion. The Mechanical Completion inspection in foreign engineering project is a kind of more conventional requirements, but seldom used in the project of domestic, also did not receive adequate attention and understanding.Mechanical completion is a necessary prerequisite to improve the system,to carry out the debugging; debugging can directly reflect the completion of quality inspection work of mechanical completion. In the debugging stage and semi-submersible drilling platform construction project of the production preparation stage and later mechanical completion, different practice our current practices and international marine engineering industry, the lack of a set of two smooth handover of the scientific process, in this paper introduces the method of mechanical completion, the establishment of database and field control method some of the control methods, the use of mechanical completion in offshore drilling platform is scientific and practical, can improve the project production schedule can also guide the production site, better meet the needs of the downstream debugging.Semi-submersible drilling platform for mechanical completion and commissioning is the direct relationship between the upstream and downstream.The debugging of semi-submersible drilling platform is verification and implementation of technical performance and quality of the platform is an important process of debugging, the quality of the work has a vital role to the enterprise, technical work is the embodiment of an enterprise in the actual state of design, technology, quality control, and through the system according to the packet the way of debugging, compared with the previous cycle and system project, obtained more professional personnel, system debugging and shorten the period of system to improve the quality of acceptance, this is a way worthy of reference.Combining with the example of a semi-submersible drilling platform, from mechanical completion, commissioning, mechanical completion is discussed in detail and the three aspects of research and debugging of order delivery. The purpose is to combine the exploration and optimization of mechanical completion and commissioning work methods and procedures of order delivery and practice, to meet the company has formed and fully meets the specification of a set of marine mechanical completion and commissioning delivery order management system. |