| In the low-carbon economic development period,the distribution network as an energy infrastructure,is an important means of economic and social development to low-carbon,it has to protect people’s livelihood characteristics.Distribution network construction level,mainly in the distribution network automation application level,and realize the key to distribution automation in the communication system construction.The distribution network automation may monitor each kind of condition of the system,carries on the long-distance operation,the protection control as well as the distribution management to the system,may reduce the system to the artificial demand greatly,reduces the movement maintenance difficulty.Due to the development of economy and the improvement of power consumption,the distribution network of Tangshan core area can not meet the needs of economic development and needs to be reformed.Based on the demand of power distribution network in Tangshan core area,this paper designs the optimal construction plan of primary grid and power distribution equipment,and optimizes the design of main station and slave station of distribution automation.Through the core area distribution network construction,To meet the load growth in Tangshan power demand,escort regional economic construction and development,effectively enhance the Tangshan power supply security,reliability. |