Research For Cost Control Of Government Investment Landscaping Projiect In Economic And Technological Development Zone

Posted on:2018-10-13Degree:MasterType:Thesis
Country:ChinaCandidate:L YeFull Text:PDF
GTID:2322330515485615Subject:Landscape architecture
Abstract/Summary:PDF Full Text Request
Since the establishment of the first Dalian Economic and Technological Development Zone in 1984,the development model of the Economic and Technological Development Zone has been practiced in China for more than 30 years.In the 30 years,the number of economic and technological development zones has gradually increased,Distribution from coastal to inland,and gradually developed.Economic and Technological Development Zone in order to improve the economic strength and accelerate the pace of attracting foreign investment,the implementation of the investment,land acquisition,planning and construction of many initiatives.In planning and construction,landscape planning and landscaping project construction has been attached great importance to the purpose of creating high-quality,with local characteristics of the landscape to enhance the image of the zone temperament,reduce industrial pollution and provide residents with open space Of the site,to further help improve the economic development of the whole zone,ecological and social benefits.As the administrative and construction main body of the Economic and Technological Development Zone,the greening project invested by the government is a public greening project with a large quantity and large amount of funds.How to use the funds effectively to create a high-quality level of landscape greening effect,that is how the Economic and Technological Development Zone Government investment-oriented green project cost control management is the need to address the issue.In the economic and technological development zone,green areas in the residential area,road green space,green space in the park square and green space in the enterprise are mostly new projects.Some projects are hindered by problems such as land demolition,incomplete municipal pipe network and electric power facilities;The enterprise level is not high,but the quality of technology,but hard,and other issues affected;some projects because of the large amount of visa is difficult to audit and capital problems such as denial.These cases are cost management management oversight.Under the special background of limited government investment capacity,we need to control costs and save money in the construction of landscaping projects,improve construction efficiency and engineering quality without delaying construction period,guarantee the economic benefits of both owners and construction parties,To create a local characteristics of economic and technological development zone green landscape.Through the research on the landscaping projects invested by the government of Ma’anshan city,which is based on the research and development of landscaping projects invested by the government in the Demonstration Garden of Industrial Transfer Demonstration Garden.From the angle of the government owner,the paper explores the feasible measures in cost control research,including ten items of project establishment,field exploration,project design,project evaluation,project bidding,contract signing,project construction,final acceptance,green maintenance and engineering audit.Principle,and method,combining with the characteristics of the government investment greening project in the economic and technological development zone,and rationalizing the afforestation construction of the four different attributes of road greenbelt,residential greenbelt,park greenbelt and subsidiary greenbelt of the enterprise.,And establish a set of scientific and feasible evaluation model,with a view to other economic and technological development zone greening construction cost control to provide reference and experience.
Keywords/Search Tags:government investment, development zone, landscaping, cost control, evaluation mode
PDF Full Text Request
Related items