Font Size: a A A

The Study And Development Of Hydropower Project Quality Inspection Information Management System

Posted on:2018-05-30Degree:MasterType:Thesis
Country:ChinaCandidate:Y L GuiFull Text:PDF
GTID:2322330512968742Subject:Engineering
Abstract/Summary:PDF Full Text Request
With the rapid development of economy in our country,the country has put a large scale of investment in the field of hydropower project,and the quality problem of the hydropower project has become the focus of people's attention.From the beginning to completion,hydropower projects need to undergo countless times quality inspection by quality inspection workers,the traditional manual management mode has a big workload,high error rate,complex in query,statistics and analysis,and it needs to invest a lot of human resources.If using the hydropower project quality inspection information management system for management,the quality supervision departments need only to extract the testing data of hydropower projects in the system,and the extracted data format is unified,data is clear,and it saves a lot of labor costs.So in hydropower project quality inspection,implementing information management system instead of traditional management method has become the trend of the Times.This article will focus on China's current hydropower project quality inspection information management problems,putting forward based on database technology to design and develop hydropower project quality inspection information management system solutions.This paper first to analyzed the status of hydropower project quality examination management information system at home and abroad and the development trend;Then from hydropower project quality inspection analysis for the demand of the information management system,after analysis of the demand of the system,has cleared about the system design goal,design the function of each module according to the goal of system design;system use the architecture of B/S,then use the Based on the J2 EE SSH(Struts +Spring + Hibernate)light framework,Struts is integrated framework,Spring is the business layer,Hibernate is the persistence layer of database.Using SQL server2008 management data to realize the development process of system;In view of the information management system in the running process often appear problem,put forward the EM-NB algorithm dealing with incomplete data,and by the method of parallel program to accelerate the operation of the system,improve the performance of the system.By implementation of the final two aspects of the system module function and performance test,in order to complete research of the hydropower project quality inspection information management system.This topic research has important value to realize the informatization development of the hydropower project information management.
Keywords/Search Tags:Hydropower project quality inspection, information management system, SSH, SQL Server2008, EM-NB algorithm, parallel programs
PDF Full Text Request
Related items