Font Size: a A A

Application Of Cement Powder Spray Pile In Foundation Treatment Of Huai River North From Project

Posted on:2017-10-25Degree:MasterType:Thesis
Country:ChinaCandidate:Y YangFull Text:PDF
GTID:2322330485991203Subject:Architecture and Civil Engineering
Abstract/Summary:PDF Full Text Request
Riverbed geological complexity, rigidity of the hydraulic structure, strength, stability and engineering costs have a major impact. Ground handling of riverbed therefore particularly important, not only involves economic issues, more related to the lives and property of the people. Widely used in cement Pile Foundation Treatment Project in bed, it is not only effective, but also more economical, beneficial to the development of water conservancy construction.Geological conditions of the construction of cement bed DJM has an important influence, this paper first introduces the basic situation of cement DJM, and then analyzed the geological conditions tile bead gate and song Sin River Gate riverbed. By settling calculations and finite element method analysis, feasibility analysis Cement Pile in the project. By field experiments testing cement DJM meets the requirements of the project to make a test. The test results of the mixing amount of cement, the intensity of the voltage and current strength of the cement DJM construction has important implications; but the geological conditions of the riverbed, the quality of the cement DJM meets the engineering requirements are more important.Today the state to increase efforts in building water conservancy projects, especially sluices and pumping stations and other water conservancy project on the river. DJM has low cost of cement, construction and the effects of cheap and good foundation treatment, construction and development and the livelihood of nation-building water conservancy projects have a great significance.
Keywords/Search Tags:Cement Pile, riverbed, hydraulic engineering, sluice, Pumping Station
PDF Full Text Request
Related items