SG New Degreaser Production Line Construction Project Scheduling And Control

Posted on:2016-04-27Degree:MasterType:Thesis
Country:ChinaCandidate:Y BaiFull Text:PDF
GTID:2321330521950340Subject:Project management
Abstract/Summary:PDF Full Text Request
Development model based on changes in demand,our timely adjustment and transition into the stage of development of economic structure,adjust the industrial structure to reduce industrial energy consumption and improve the living environment as the primary task at this stage.The conservation of resources,improving the environment as an economic strategy focused on building a resource-saving society and environment-friendly society,will be needed in the industrial system corresponding to this form a strong support,the entire industrial system an important component of the new chemical products(degreasing agent)is section.SG Industrial Company project has already begun to focus on promoting the traditional industries of high technology,the development of technology-intensive industries,vigorously develop strategic emerging industries,focusing on market demand and industrial development,cooperation with Germany HG group,developed with independent intellectual property rights and market competitiveness of major strategic product,to make up for domestic high-tech products(such as degreasing agent)market dependent on imports of defects,enhance the core competitiveness of local key industries,promote energy conservation and environmental protection,social development for the local economy to play a demonstration effect.The main contents of this paper include the following three aspects:(1)In this paper,the project management knowledge as the basis for the new SG degreasing agent production line construction project as a case study to explain the project schedule management and control principles and methods of application in transformation practice.(2)In limited human,financial and material support conditions apply knowledge of project management,and optimize the project schedule,strict and efficient implementation of the project schedule control.According to characteristics of the project,the working structure of the project and confirmed the allocation of responsibilities decomposition draw network diagrams and Gantt charts.(3)By applying knowledge of these modern project schedule management of SG degreaser new production line construction project progress control measures analysis,we put forward a comprehensive schedule management,and ultimately ensure timely completion of the project as planned.
Keywords/Search Tags:SG new degreaser, Project schedule, Production line
PDF Full Text Request
Related items