Font Size: a A A

A Research On The Risk Control Of HR Elevator Industry Park Project

Posted on:2016-08-27Degree:MasterType:Thesis
Country:ChinaCandidate:S J YanFull Text:PDF
GTID:2309330482474802Subject:Business Administration
Abstract/Summary:PDF Full Text Request
With the continuous improvement of people’s living standards, the demands for living environment is also increasingly high, while the use of the elevator greatly facilitate the daily life of residents. According to data analysis, the current National Elevator sales volume has reached about 700000 units, and since 2005, the number of China’s elevator procurement has performed a growth trend. Driven by such a huge demand, China’s elevator industry has achieved a certain success that sales reached the world’s first, now become the world’s largest elevator manufacturing country. After entering the twenty-first Century, the information technology is highly developed, as the social life is becoming more informationize and internetize, the knowledge renewal cycle is becoming shorter, the enterprise is generally subjected to the threat of potential risks and the pressure of competition, the elevator manufacturers also inevitably be challenged.If elevator company want to make development it will be necessary to develop technology, to provide more high performance products, for expanding market share.This thesis takes the HR elevator industry park as the research object, introduces the situation and the environment. Using the break even point(BEP) analysis.sensitivity analysis, and analytic hierarchy process(AHP) to analyze the project of HR elevator industry park. Based on the Researches: the project has some risk, include the project initiation, design phaseand construction phase., To ensure the healthy development of enterprises, and to identify and analyze the risk level of each risk source, according to the political and social environment of HR elevator company, After analysis, we found the primary risk include market risk, political risk, technical risk, the subprime risk include design technology and quality risk, social risk,construction safety risk, product price risk, production management risk, raw material price risk, capital risk, the third level risk include natural risk, construction risk of cost overruns, inflation risk. According to risk theory and risk management theory, the risk of project needs a reasonable risk response plan.This paper is of great significance for the development of the HR elevator company to strengthen risk control and enhance the competitiveness, and the same to other elevator enterprises.
Keywords/Search Tags:comprehensive risk management theory, elevator, risk control, analytic hierarchy process
PDF Full Text Request
Related items