| Nowadays the informatization is under the very high speed development. When we join the WTO, the TeleCom industry, as the target for revolution of completely commercialization and breakthrough the monopoly, is becoming of much competitions. Upon the High demanding of telecom-engineering service, the risk in the engineering project is being very serious as the consequence of diversified technologies, shorten period and the complication of the coordination during the engineering project. That is the reason why the research of risk management during the tele-com engineering project is becoming so important, such as how to build up the efficient risk prevention system, especially in the huge tele-com engineering projects. The study of the topics about risk management and contingency plan in tele-com engineering project are definitely of theoretical interest and great relevance to applications.In reality, the uncertainties affecting the cost of risks during the various tele-com engineering projects are on the rise. The responsible team, including the project sponsor, the engineers and the project manager must be competent to identify the potential risk, find the risk management method and build up systematic corresponding solution for any contingencies during the project. All the effort is to minimize and avoid any loss caused by the risks of tele-com engineering project. To undertake the project, technical staff and managers must from theoretic and actively carry out the risk management research, from the practice proved. Making method of risk management, suitable for Telecom Construction project risk early warning system and emergency plan, are key to reducing and avoiding engineering risk.This essay is mainly about the research of the risk management and contingency plan for tele-com engineering project. And through practice, participate in the construction of the internal management process of Shanghai Telecom Engineering Company, set up a complete risk management framework, and formulate the corresponding risk emergency response plan, project management, risk control level is improved.It is talking about the methodology of risk prevention, the systematic process of risk management and how to make the contingency plan with the demonstration. Greatly reduced the possibility of telecommunication engineering projects in the whole process of risk. |