Font Size: a A A

Risk Identification And Evaluation Of The Construction Of University Electronic Bidding Management System

Posted on:2016-03-22Degree:MasterType:Thesis
Country:ChinaCandidate:L KeFull Text:PDF
GTID:2297330479994995Subject:Project management
Abstract/Summary:PDF Full Text Request
With the country’s high degree of attention and support to education, the investment in Colleges and universities more and more. How to effectively use the government investment funds, this is the core issue of University tender procurement. However, the traditional bidding and purchase mode is not only difficult to meet the requirements of the tender, but also a breeding ground for corruption.. With the rapid development of modern network technology, efficient, high quality, open and transparent electronic bidding will gradually replace the traditional bidding mode, but as a kind of newly emerging things, electronic tendering and bidding system in the implementation process may bring all sorts of risks. How to control and manage the risk of the construction of the electronic bidding system is a problem for the university to implement the electronic bidding and bid urgently.Through analysis and research of the bidding management work of colleges and universities bidding, according to the characteristics of the electronic bidding, using the method of risk management, analysis the electronic tendering and bidding system in the construction of the presence of risk. First, according to the flow chart of the bidding and the construction of system, of the electronic trick bidding system construction are classified according to the sources of risk, environmental risk, technical risk, management risk, economic risk four risk factors; Secondly according to the recognition results, the fuzzy hierarchy comprehensive evaluation method, qualitative and quantitative analysis of the risk factors, obtained the maximum weight for technical risk 0.467, technical risk on the system construction of the greatest influence, and of the electronic recruit bidding system of construction risk assessment is 0.30, belong to low risk; then according to the results of the evaluation for risk factors put forward the corresponding prevention and control measures, the focus on risk of key management. Specific response including and strengthen stakeholder communication, one by one refinement of requirements, the important documents were encryption processing, strengthen learning related laws, the establishment of integrity assessment system, a sound management system, formulate detailed cost plan and so on. Finally, the development of monitoring risk, the risk of tracking and correction, control and reduction.This paper also briefly introduces the electronic bidding system of G University, and expounds the realization of the function of the core link.. The application of risk management in Colleges and universities recruit bidding system in the construction, hope for the construction of University Library’s electronic bidding system to provide reference, the bidding resources sharing, so as to promote the development of China’s colleges and universities electronic bidding, reduce the cost of the tender, improve the tendering and bidding procurement of quality and efficiency, promote the anti-corruption construction in universities, reform of colleges and universities bidding in China.
Keywords/Search Tags:Electronic bidding, Risk Identification, Risk Evaluation, Control, university
PDF Full Text Request
Related items