Ordinary institutions of higher learning and the mechanic colleges and universities is the essential difference between the two different education level and cultivation object and target requirement is different, the latter to carry out the main vocational education is to cultivate practical ability to operate the intermediate class, senior worker, technician and senior technician level of technical workers, and practice base construction is the key to improve the quality of practice teaching platform, has direct influence on the realization of training objectives, strengthening practical base construction is particularly important. At present, the research on practice base construction projects are reported, to strengthen the research of the project risk, have important theoretical and practical significance.Based on guangxi petrochemical senior vestibule school "simulation oil refinery project as an example, from project to project the potential risks during the whole process of operation and management, application of relevant theories and methods of risk management, the key to the project stakeholders, capital, quality analysis, evaluation, trial operation management etc. Through literature research, interview and investigation and analysis, understand the latest theory research dynamic, for the project management team to provide information about risk and data, and collection of project management and related technical personnel management experience, through the reasonable use of various risk measures to implement effectively control risk of the project, "as possible with minimal cost to ensure the overall goals of your project implementation, also for GuangXi District should be used in practical teaching of campus factory "bases on the theory and practice of the project is to provide reference, promote the development of vocational education better and faster. |