Font Size: a A A

A Translation Project Report About Scope Description Of Requirements On Coal Fired Power Plant Project

Posted on:2016-02-05Degree:MasterType:Thesis
Country:ChinaCandidate:J MaoFull Text:PDF
GTID:2285330482451033Subject:English
Abstract/Summary:PDF Full Text Request
This is a report on translation of "Scope Description" of Employer’s Requirements on Coal Fired Power Plant Project. The section of "Scope Description" includes a general description of the Project, and a detailed description of the Contractor’s expected scope of works, the responsibilities and obligations of the Employer and Contractor, the technical requirements and specifications for major equipment and facilities associated with the Plant.When translating the source text, the writer encountered with some problems, including specialized word selection problem, translating methods and skills of passive voice, non-finite form of verb and long and complex sentences etc. And finally, the writer finished the report based on the translating notes which shows the experience from the translating task.This report is divided into five parts. The first part is about the analysis of the source text including the text content and features. The second part is a brief review of the translation process, which includes preparing, translating, revising and the finalizing stages. The third part is the core of the report in which the author has selected several examples to analyze the translation problems and skills in specialty English for electric power. The forth part shows the experience and the lesson gained from the practice. The last part is a summary of the report.
Keywords/Search Tags:electric English, translation skills, long and complex sentence translation
PDF Full Text Request
Related items