Study On Cost Management Of Construction Project Bid Sixth Of The China Burma Oil And Gas Pipeline

Posted on:2017-05-04Degree:MasterType:Thesis
Country:ChinaCandidate:Q XuFull Text:PDF
GTID:2272330488455363Subject:Project management
Abstract/Summary:PDF Full Text Request
Myanmar oil and gas pipeline construction project cost control is the core of pipeline construction project management component in the entire project implementation process, to ensure the project within the approved budget as much as possible good to complete, need to carry on the management to the each process. Myanmar oil and gas pipeline sixth tenders of construction project as the company’s main income generating projects, should be scientific strengthen cost control, increase income and reduce expenditure, make the enterprise to get more profit.Based on the clear background and research status at home and abroad, first introduced the general situation and the process of production organization construction project sixth tenders related to the concept of pipeline construction project cost management and the China Burma oil and gas pipelines, summarizes the content of construction project bid sixth of the China Burma oil and gas pipeline cost accounting, analyzes the characteristics of cost management of construction project bid sixth Burma oil and gas pipelines, discusses the construction project faced sixth section of the China Burma oil and gas pipeline in the process of cost control problems; then according to the construction project bid sixth of the China Burma oil and gas pipeline labor cost, material cost, equipment cost and indirect cost control is not in place, take the method of problem oriented, from the construction preparation and construction process three, the completion of inspection rectification process proposed cost control ideas, and separately from the personnel cost, material Cost, equipment cost, site preparation cost, design change cost, claim costs, indirect costs etc. puts forward cost control measures; finally, starting from the project relies on the enterprise, gives the Myanmar oil and gas pipeline sixth tenders of construction project effective implementation safeguard measures of cost control.
Keywords/Search Tags:China Burma oil and gas pipeline, construction project, cost control
PDF Full Text Request
Related items