Research On The Cost Control Of Intelligent Substation Project Construction

Posted on:2016-12-21Degree:MasterType:Thesis
Country:ChinaCandidate:Y HouFull Text:PDF
GTID:2272330470972071Subject:Project management
Abstract/Summary:PDF Full Text Request
In recent years, the market presents a complex and changing characteristics, in order to survive and develop in this environment, companies need to break the power of the original idea, to seek a new path of development of a unique, cost-effective control of the project as one important way, has was concern in the community. Project cost control is the power of enterprise management reform and improve an important part of the breakthrough, therefore, research on improving the cost of project cost control system, improve the competitiveness of enterprises have certain theoretical and practical significance.This paper describes the background and significance of intelligent substation construction projects were analyzed for the domestic and foreign research status of project management to the overall development of project cost management and control of a systematic understanding of the theory and detailed cost, project cost management provide a theoretical basis for the empirical study of later. Meanwhile, smart substation construction projects and control the whole process of model analysis, target costing, activity-based costing and earned value method of cost control methods to summarize and generalize. Secondly, through the celebration of qingyang substation construction projects in-depth research, get the actual data of the project, while the verification target costing, activity-based costing and earned value method is effective and feasible cost control in. The improvement of the quality index of the earned value method for the comprehensive construction cost control of the sheep substation, and the effect of project construction cost is analyzed by using fuzzy evaluation model. Finally, the existence of the current intelligent substation construction projects carried out in-depth research and analysis of issues, make recommendations, in order to improve cost control intelligent substation construction projects. Through research, we find that the target costing method and the improved earned value method have some practical value for the cost analysis. Through these studies, hoping intelligent substation construction project cost control has some reference, and effectively improve the level of cost control and investment returns.
Keywords/Search Tags:intelligent Transformer substation, cost control Goal cost management, Activity-Based, Costing Earned value analysis
PDF Full Text Request
Related items