| Nowadays, with the modern life keeps a very fast peace, people not only have higher level on the shape of the architecture, but also on the functions of the architecture. So more and more specific sectorizations of the building comes out, as well as the methods of the construction.Suspension structure has much advantages on solving the problem of the function of the building usage. As following:(1) This structure can supply enough space to satisfy the different building function demand.(2) People can regulate its power specification to reduce the vibration effect under the wind load.(3) People can improve the work efficiency through the various methods of cross construction.(4) The structure makes full use of the materials nature to reduce the cost of project. And also has many other advantages.So, it is very important to have a deep research on this structure and this deep research can optimize the methods of building.In this thesis, I combined some real examples and this structure to do some deep research:(1) The analysis of the specific construction method under the suspension structure. This chapter mainly introduce this structure on the following aspects:this structure craft of construction methods, the order and the process, and the compare of the different schemes which have different installation of the key parts. Through this people can give the basic and reliable theories, and these theories is helpful to the building methods.(2) The experimental subject is a office building. And select7-9floor K-M axis cross4-20axis. Through finite element soft ANSYS to build structural model, imitate this structure force situation, analyse the possibility of improvement of the methods. Strictly control the construction quality, consider the transformation elements influence, with specific measurements. At the same, people calculate the structural steel theory. And finally, people compare the measure result and the theory result. People can get a control method of construction quality. Just like engineering structure.(3) At last, according the reality of the project, people come up with some ideas to optimize the suspension structure, and get the goal of saving cost, improve the quality, as well as saving time. |