Font Size: a A A

Research On The Convergence Mode Between The Phrase Ⅱ Of Line9and Changping Line In Beijing

Posted on:2015-09-17Degree:MasterType:Thesis
Country:ChinaCandidate:H Y ChengFull Text:PDF
GTID:2272330434950127Subject:Transportation engineering
Abstract/Summary:PDF Full Text Request
With the development of China’s rail transit network gradually. The impact of rationality on the operational efficiency of rail transport convergence form is more and more significant to the operational efficiency. Currently there are some problems exsist in the convergence form of rail transit lines.For example,The lines of Beijing Metro City and the Urban convergence at the fringe of City by designed Generally, not at the final destination or the main destination in suburb.So, it causes great stress of transfer and great inconvenience to passengers.For the reason that there is great important practical significance to research the lines of City and Urbans’convergence model.Beijing Urban Construction Design&Development Group Co., Ltd.began the research on the joining mode between the second phrase of line9and Changping line in2013. This article start to analysis the convergence style between the line of UMT City and urban. On the basis of the construction of Metro, In-depth analysis of convergence model between Beijing City and urban lines, and the passenger data of each convergence line, investigating suburban passenger alignment and the main destinations into the city, Then with the In-depth and detailed analysis of convergence model between line9Phase and Changping line. Contents following:(1) The analysises of convergence mode about line9and Changping line, the main line of passenger information related Changping line were analyzed, considering the situation in the future development planning of Beijing, comparing and analysing the transfer convergence program at the edge of the city and through the convergence programs, derived through the convergence program is more suitable for solving traffic problems Changping Line;(2) The project interfaceissues of Line9and Line9Phase Ⅱ National Library Station:Since line9Phase I long-term extension conditions had been reserved. Therefore, convergence form was determined as the program to run through. This thesis analyzes the feasibility of the project from the perspective of project implementation mainly;(3) To analysis the convergence pattern of Changping line extended to Mingguangqiaoxi station southward docked with line9.From the detailed comparative analysises of traffic characteristics、operational organization、vehicles、depot and integrated bases、station architecture、communication signals and electrical systems and the aspects of investment and so on. The program of initial transfer and forward through was recommended.The studies and programs of this paper will have a better reference for value on similar projects.
Keywords/Search Tags:district line, urban line, convergence mode
PDF Full Text Request
Related items