Font Size: a A A

Construction Procedure Research For Pipeline And Piping Of CO2-EOR Oil & Gas Field

Posted on:2015-04-11Degree:MasterType:Thesis
Country:ChinaCandidate:M ChenFull Text:PDF
GTID:2271330503455754Subject:Oil and Natural Gas Engineering
Abstract/Summary:PDF Full Text Request
According to the requirement of the revised plan for Enterprise Standard, CNPC, 2013,the test and research of construction procedure for gathering pipeline and plant piping of CO2-EOR oil & gas field was started to finalize the construction procedure and related technical Specification..The article discussed the technical specification of construction for CO2-EOR oil & gas field station process piping and gathering pipeline, researched CO2-EOR technology and comprehensive analysis of pipeline engineering, combined with the natural conditions, new materials and fluid characteristics,studied the construction process, settled technology process and content of the project, complemented construction technology requirements, personnel requirements, equipment requirements, etc., completed the process research of construction technology. The project includes overall research of welding technology, combined with practical engineering, studied the various factors of engineering conditions, improved the relevant technical measures and requirements, completed the construction technology measures and technical parameters, investigated the high containing CO2 gas field and multiple tube, determined the NDT method and welding technique. Base on the construction experience and the difficulties encountered in the process of implementation, NDT method and ratio of the pipeline are adjusted. Stainless Steel Carbon Steel Clad Pipe welding ray detection film studies, to determine steel tube defect of ontology. According to research compiled "technical specification for construction of CO2 flooding oil and gas pipeline, the CO2 flooding technical specification for construction of oil and gas station process piping and through the review.
Keywords/Search Tags:Construction Procedure, CO2-EOR, Piping an pipeline, oil & gas field
PDF Full Text Request
Related items