Pick to Crystallization in research and development and application of coal combustion and desulfurization denitration removal project, such as our country attaches great importance to this work, and regulated in the evaluation of project management. If the state of the thermal power company atmospheric pollutant emission standard "(GB13223-2011) of the relevant standards and regulations to measure words,Beian company a lot of emissions of pollutants is a must for rectification, especially boiler no. 1, 2, and 3 release of nitrogen oxides, far exceeds the national standard of 200 mg/Nm3. Today, the increasingly serious environmental pollution, people to the requirements of environmental protection is increasing day by day, at the same time, the government is also push forward the denitration electricity price. In order to improve the quality of atmospheric environment in the region, to meet the requirements of the national and regional environmental protection laws and regulations for, guarantee the development of electric power and environment coordination, cut the existing unit nitrogen oxide emissions has become inevitable. To this end, the company’s management through the denitration project implementation of the project.From a scientific point of view, people in the design of denitration, nox concentration will control within 100 mg/Nm3. In the context of the present situation, the company release the concentration of nitrogen oxide in the boiler at work, at least in the more than 600 mg/Nm3, sometimes even can reach 750 mg/Nm3, that figure has gone far beyond the national and local standards, to reduce nitrogen oxide emissions for the current company is a difficult and urgent, important work.In this paper, the preliminary evaluation of denitration project Beian company in-depth exploration, first of all projects and related project management theory, the definition of project, project and the characters of its own interpretation and combed some of the more common in practice for project evaluation method; Then the paper introduces the SCR denitration project soon thermal power co., LTD, the determination of process scheme, on this basis to further study the project within the denitration technology solutions and systems that are included in the project investment estimation, investment situation is analyzed, then the evaluation of the denitration project implementation to probe them. From financial, environmental, economic, social, and many other angles has carried on the comprehensive evaluation of the project, and finally to all aspects of the evaluation of comprehensive analysis, it is concluded that the feasibility and necessity of the project implementation, and puts forward corresponding proposals for solution of concrete implementation. |