On The Audit Tracking OperatIOn Of Iandscape Engineering

Posted on:2014-09-23Degree:MasterType:Thesis
Country:ChinaCandidate:Y LiFull Text:PDF
GTID:2269330425462294Subject:Architecture and civil engineering
Abstract/Summary:PDF Full Text Request
With the rapid development of the city construction, the need of landscape green construction grows as well. With the rise of people’s standard for the environmental building, landscape greening has been highly valued be the government and many companies. Therefore, in order to standardize the management of the landscape greening projects, it is necessary to apply the follow-up auditing to all the projects in progress.The auditing bureau of Beihu area, Jining City implemented a general follow-up auditing focusing on the landscape green construction, found that there are some problems on the control of the cost of the landscape green construction, mainly appeared in:changing the string of the plant randomly, misrepresenting the quantity of the concealed work, disqualification of the standard of the plants, etc. Those problems lead to the low or medium marked price, and the high settlement price. Its an important problem to be discussed that how to effectively follow up the whole auditing process, thus control the cost of the landscape greening projects.To guarantee the quality of the auditing of the landscape green projects and follow up the whole process, we should attach great importance to the preliminary work of the auditing like building the auditing team, equipment preparation, collecting the resources, etc. Therefore, we can improve the efficiency and the quality of the auditing work。Engineering investment project auditing is the process to investigate the authentication and rationality of the project, enforce the management of the preliminary work, so that you can discover the problem early then the mistakes when you make decisions and the unnecessarily waste of the cost can be avoided. The auditing staff should enhance their knowledge about reconnaissance and design. Bidding auditing is an important component pf the whole follow-up auditing process, mainly focusing on the auditing of the paper of the call for bidding, bill of quantities, the highest price control, the bidding process and the paper of the bidding. The construction project contract is the legal authority of the responsibilities and the right of the contractor and the contract-issuing party; it requires the auditing staff with enough legal background to audit the contract well.This article explored the way and foundation to improve the quality of the follow-up auditing by comprehensively explained the follow-up auditing of the garden greening projects based on analyzing the issues of the auditing of the scene and the process. It also indicated the rough path to develop garden greening project follow-up auditing. It meant to propose the basic implementation plan and the operational guidance of the garden greening project follow-up auditing, to achieve the win-win situation of the national economy and the future development. It’s also significant to the sustainable development of the country, as well as the improvement of the society, politics, economy and the environment of China.
Keywords/Search Tags:Garden Greening, Follow-up Auditing, Implementation Plan, Operational Guidance
PDF Full Text Request
Related items