Font Size: a A A

Research On Application Of Project Management In CRG Company In The Construction Of Information System

Posted on:2014-02-14Degree:MasterType:Thesis
Country:ChinaCandidate:J Y WuFull Text:PDF
GTID:2269330401466120Subject:Project management
Abstract/Summary:PDF Full Text Request
Chengdu Lancky Real Estate Development Co., Ltd(also called Lancky Real Estate inshort), built in2008, is a local enterprise aiming at developing the real estate. Thebusiness of the company varies from real estate development, operation to themarketing. To further extend the market of Chengdu real estate and establish the brandof Lancky, the company has successively developed Tong Zilin European Community,Lancky Loung Community, Lancky Community of Fortune Today, Yuanyang LangCounty and Natural Country etc., the building area of which adds up to six billionsquare meters and which mainly belong to residential area for business includingfirst-rate urban mansion, urban apartment elaborately designed and decorated and topbusiness community etc.Chengdu Resource Management Information System (CDRMIS) of Lancky Real Estate,an essential project for informationizing the company, bears the main business ofproject operation and can directly affect the effectiveness and efficiency of theinformational construction. At present, during the establishment of CDRMIS, manyproblems like the complexity of the project demands, the difficulty of managing theselection, requirement for high quality and the long implementation cycle etc., need tobe solved. Therefore it’s of great significance to do a good job in managing theCDRMIS project.The author, responsible for the management of the CDRMIS project, will analyze thecurrent situation of management, management features and a series of problems to besolved. Using the relative theoretical methods in the project management, this paperwill study the problems from the following two perspectives of the establishment of thesystem, i.e. scope management and purchasing management in detail.In the aspect of scope management, this essay will come up with functions, performance,operating environment and other contents that should be included in requirementgatherings in the project scope management of CDRMIS by addressing the issues ofinsufficient requirement survey, unclear project scoping, rough work breakdown structure, and so on in the light of the actual conditions of CDRMIS, and also putsforward that ways of functional decomposition can be used to conduct work breakdownstructure and improved methods can be used to identify the project scope specifically inaccordance with different levels.In the aspect of purchasing management, this essay firstly puts forward that purchasingplan in project purchasing management should include project startup, index designelection, tender compilation, tendering mentoring and other stages by analyzing thepurchasing plan, bidding process, source selection, contract management and othercurrent situations in the construction project purchasing management of CDRMIS. Italso comes up with the bidding process and bidding notes of the information system,principles that the supplier should follow, and other improvement methods.The project scope management and purchasing management mentioned in the essayhave applied in construction project of CDRMIS, and its related research results haveimportant referential meaning in the specific development of construction project. Thisessay also analyzes the general rules of the construction of the real estate managementinformation system, and its related research results can be used as reference for otherreal estate enterprises to construct and manage their management information system.
Keywords/Search Tags:project management, scope management, purchasing management
PDF Full Text Request
Related items