| In the environment of construction market that fierce market competitionand supply greater than demand, project offering based on winning the bidwith Low-priced impose new requirements on participants to deal with thecontradiction between cost and quality. Individual enterprises, especially notscale enterprise is easy to be eliminated, how the project quality to meet therequirements under the condition of ensure the participants’ profit and how toestablish the cooperation mechanism, not only to realize the goal of qualityand cost, but also a coordination between interests of the collective and theindividual, then create a win-win situation are the main problems discussed inthis paper.This article put forward a classification of engineering quality cost basedon the theory of quality cost, and analysis the quality cost control method onthe level of people, materials and machine; Considering there are somedifference in the quality prevention and appraisal level that will refer todifferent quality qualified rate and whether it can discover the inevitableproblems in time, the result of different degree of probability generalcontractor and the subcontractor a is divided into seven possible; Againbecause of the cost of the owner’s appraisal of quality cost how much impactit checks in the process of the supervision and inspection of the probability ofsuccess, general contractor of the prevention cost of quality cost of how muchinfluence it in the process of engineering construction project qualityqualified probability, so in their respective quality on the question of howmuch the cost of the owner and the contractor as a game of both sides, throughthe game matrix and game returns to discuss the best countermeasure; Finally,engineering quality cost incremental cost analysis, cost analysis of processquality and the best quality level implementation Suggestions on three aspectsaffect the quality of the project cost factors other than the interests of the subject of the participants are discussed.For engineering optimization of quality cost control work should not onlystay in the accounting period, should be to control the timing of the forward,took the part quality cost into account in decision-making, in order to make adecided in of project overall goal realization. Deduced based on theparameters of several promotion project coordination suggestion, the overallobjectives and the interests of all parties can be used as the decision-makingreference. Papers on the owner and general contractor quality cost decision tojoin in the discussion of the quality improvement of the element, and theworking procedure quality costs resulting from the interaction between factorsof discussion, the study is relatively rare in the field of engineering, to thequality cost management has reference meaning in engineering practice. |