Font Size: a A A

Analysis Of Present Situation And Countermeasures Of Flood Control System In Licheng District Of Ji’nan

Posted on:2014-01-06Degree:MasterType:Thesis
Country:ChinaCandidate:Y J ChuFull Text:PDF
GTID:2232330398461640Subject:Water conservancy project
Abstract/Summary:PDF Full Text Request
Flood control, is based on a series of organized social activities to control flood and reduce disaster and expansion for the purpose of. Flood control system is the institutions involved in the process of the flood control organization, engineering measures, not an organic whole elements of engineering measures, its flood as the object, to disaster reduction as the goal, to flood control projects, flood control organization as the main body of the behavior. Water is the valley as a unit, the construction of flood control system in River Basin as a unit, flood control system is an important means and basis of modern flood control, along with social progress and development of science and technology, it is becoming more and more complex, functional improvement. This paper closely in Licheng District of Ji’nan Yufu actual situation of river basin flood control, flood control and reference of domestic and foreign advanced system construction experience, analysis and application to study of Yufu River Basin flood control system construction. The main contents are as follows:1. comprehensive analysis of the status of flood control system1Licheng basin and the existence question, pointed out the main problems existing in the practical measures for flood control basin.2. on the basis of brief introduction of the developed countries in the world of flood control strategy development direction and trend, referring to the excellent achievements and experience, analysis of the construction and application of the flood control system in Licheng District in Licheng District, clear river basin flood control system should include the engineering measures (dike engineering, reservoir reinforcement, embankments, river comprehensive rectification of governance etc.) and flood control non-engineering measures (typical ecological and environmental protection, flood forecast, flood control policies and regulations, flood risk management and flood insurance) two aspects. 3.to strengthen the construction of Licheng District flood control engineering measures, to further strengthen the building of non engineering measures, described in detail the construction of flood control system scheme of Licheng District basin. And put forward the corresponding suggestions on implementation problems found.3in this paper developed the national flood insurance development situation, in view of the practical problems of the development of flood insurance in China, analyzes the problem of insurance in Licheng District of river flood control.The last part is the conclusion, and puts forward some reasonable suggestions.
Keywords/Search Tags:River Basin flood control system, the analysis and application offlood control project construction, measures, flood insurance, flood controlnon-engineering measures
PDF Full Text Request
Related items