| "Republic of China on Environmental Impact Assessment Law" was formally implemented in2003and provides for the implementation of planning environmental impact assessment system. Environmental Impact Assessment is in the planning stages of preparation, planning and implementation of the possible environmental impact analysis, forecasting and assessment, proposed to prevent or mitigate adverse environmental impacts policies and measures for tracking and monitoring methods and systems.In today’s social situation, and vigorously strengthen the planning environmental impact assessment is to implement the scientific concept of development, optimization and adjustment to promote economic development and other related policies, programs and plans for the development of circular economy, promoting ecological civilization construction so as to realize the importance of sustainable development of the national economy assurance measures. Planning of the EIA implementation in recent years, in promoting economic rational distribution and coordination of social harmony and development to meet the environmental capacity and environmental safety, prevention and control of new pollution sources and improve the quality of the environment and achieved good social effects. However, due to late start of planning environmental impact assessment, which is still in its infancy, practical work, both technically and institutionally there are still some deficiencies and problems, sum up the following main points:1) lack of industry planning environmental impact assessment guidelines, many Planning of the EIA content tend to project EIA;2) public participation in the timing is not clear, public participation, enthusiasm is not high, the depth is not enough;3) Evaluation lack of maneuverability;4) Planning of the EIA review of administrative rules are not standardized, and law requirements of the EIA implementation planning efforts.This industrial park is on the one hand, EIA analysis of the specificity and the actual work on the case analysis and summary of experience, planning for future industrial area made implementation of the EIA reform and improve the existing planning of the EIA system, establishing a public participation Planning of the EIA system and comprehensive planning, environmental impact assessment technical guidelines and other recommendations, and that planning environmental assessment can draw on water, air, noise and ecological environment assessment guidelines specified in the evaluation method and evaluation of content, you can also on the environment can leam the impact of the project EIA evaluation. In terms of content and also can refer to the depth of water, gas, sound, ecological assessment guidelines for the preparation of the relevant provisions. On the other hand with the industrial park planning and EIA analysis of the case that the limits approved by the regional constraint mechanism can play a role, but under certain conditions, this effect is sometimes negligible. We should dare to undermine the environmental assessment planning guidance for the planning, through the establishment of a series of relevant laws, rules and regulations related to supervision and regulatory mechanisms such as the planning is the concrete implementation of the EIA views are the fundamental guarantee. |