Current Projects Under The Bill Of Quantities Contractor Risk And Copying Strategies

Posted on:2012-05-29Degree:MasterType:Thesis
Country:ChinaCandidate:G X LiuFull Text:PDF
GTID:2219330362953877Subject:Business Administration
Abstract/Summary:PDF Full Text Request
Bill of Quantities in ways that favor companies with their own management, market conditions and offer independent engineering to improve the competitiveness of enterprises in the construction industry, in the implementation process is also quite a number of new problems. Inventory valuation norms to reduce the relative risk of the contractor, if the contractors do not pay attention at all stages of project implementation in the professional and the combination of laws and regulations, pay attention to well-founded claim their rights and their legitimate rights and interests are still not protected.In this thesis, list pricing as the main body of engineering and construction cost for the two wings of the law, through the project bidding, contract performance, contract changes to settlement stage, the main quantities of the existing pricing model to analyze and study the risk of the contractor in this mode Identification and analysis and response strategies, combined with existing laws and regulations and some case studies to learn the laws and regulations by contractor to improve their response capacity of knowledge and use of legal weapons in risk prevention, in order to safeguard the legitimate rights and interests of the contractor to provide a theoretical basis.This thesis is a bill of quantities of engineering development and implementation process to analyze the problems, and policies of relevant laws and regulations are summarized; Secondly, the contractor in the project by analyzing the bill of quantities of risk factors exist, identify the contractor in this mode, the tender offer, contract performance, contract price and the settlement process to change the risks, combined with a detailed case risk analysis, risk of the contractor to deal with these preventive measures; Finally, the analysis concluded, the contractor proposed to promote measures to safeguard legitimate rights and interests. Therefore, there should be targeted to receive professional business guidance to learn and master the relevant legal knowledge, especially in the course of the Bill of Quantities will apply legal knowledge to the project management of organic all stages, the maximum to avoid risks, to effectively maintain deserve their own interests.
Keywords/Search Tags:Bill of Quantities, Risk Identification and Analysis, Copying Strategy, Promotion measures
PDF Full Text Request
Related items