Research On Cost Control During The Entire Process Construction Of Jiarun Manor Housing Project

Posted on:2012-05-01Degree:MasterType:Thesis
Country:ChinaCandidate:S W LiuFull Text:PDF
GTID:2219330338964487Subject:Project management
Abstract/Summary:PDF Full Text Request
Jiarun manor housing project is empoldered by CRED HOLDING CO. LTD and the some bureau of Zibo. The bureau attempts to carry on cost control during the entire process construction to smooth the project construction. The cost control in project management is one of four big control objectives. Nowadays, cost control during the entire process construction in projects is at the attempt stage. To find out the cost control's contents during the entire process construction in Europe, the US and Asia, combining the present situation on cost control in China, this thesis explores cost control mode during the entire process construction suiting this project. The cost control during the entire process construction of Jiarun manor housing project is divided into the investment initiating project stage, the design stage, the bid stage, the construction stage and completion stage, which are relating to each other. In all of them, the cost of the following stage takes this stage as the goal, and the investment initiating project stage and the design stage are the key, which determine the contents of cost control in the following stages.The exploration to the cost control during the entire process construction of Jiarun manor housing project has basically achieved the anticipated goal. Finally, the problems which have appeared during the entire implementation have been carried on a simple summary, and the situation of the actual project management has been discussed and analyzed objectively.This thesis embodies several main innovations, such as the practical application to the cost control during the entire process construction, the attempt that has utilized the value engineering method to select the optimal plan, having used the information of the finished buildings to estimate the cost of following projects at cost simulation and emulation, having carried on the investment estimate using the productivity exponential method.
Keywords/Search Tags:Jiarun manor housing, housing project, cost control, architecture
PDF Full Text Request
Related items