| BT mode as a new financing mode, due to its strong financial capabilities and several successful operations on the subway project to be gradually extended on subway project. However, there are some problems on the application of BT on the subway, such as between the interests of both investors and the government are not clearly defined boundary conditions, the project lasted longer and how to ensure that contracts implement and successful repurchase, so this paper study the subway project management based on BT mode.First the basic theory of BT patterns are reviewed, introduced the origin, scope, operation program, mode of operation of BT mode. Then analyzed the specificity of BT subway, from the difference between BT and BOT, the difference between BT and the construction Loaning, and BT policy interpretation. Then define the boundary condition:BT subway projects investment yield, buy-back period, repurchase the base, repurchase methods; and BT subway project risk analysis, mostly the major risk of contract enforcement risk and repurchase risk. Then design the BT subway contract major terms, about boundary conditions, the contract price adjustment, break the terms and various types of guarantees; by analysis BT subway project management processes, and workflow designed organizational structure mode suitable for BT subway, and finally through case studies to validate before.Research of the subway project management based on BT mode, this article studied only one part, there many worthy study contents, which could improve and standardize the acting of BT mode on subway. |