Font Size: a A A

"point System" Management Of Installation Projects In Applied Research

Posted on:2007-05-25Degree:MasterType:Thesis
Country:ChinaCandidate:H Y WangFull Text:PDF
GTID:2209360182481422Subject:Business management
Abstract/Summary:PDF Full Text Request
"Point" indicates some eligible work load that can be done by a qualified workerin the normal condition in one man-hour. Complex work load can be measured byuniform points, which can deal with controlling of quality, schedule and costby fully using computer system. There are following significances in erectionproject management.First, to measure, control and adjust different level schedules, and optimizehuman resources according to point efficiency.Second, to assign points load to quality control activities, and keep theintegrality of project management.Third, to measure and command project payment, and scheduling, quality controland paying can be organically put together by points.Man-day is included in domestic budget ration, so "point system" can be appliedin domestic erection projects and take good effects by referring to the rationand the case of the project.In the paper, the theory on the "point" has been demonstrated by analyzinga serious of the given data. Antitheses and induction have been adopted withthe examples in the research. If the point can be applied in domestic erectionproject is preliminarily analyzed by showing how the point is calculated forthe item listed in the budget ration.
Keywords/Search Tags:point system, schedule, quality, cost, and application
PDF Full Text Request
Related items