Font Size: a A A

Petrochemical Construction Progress Of The Project Management Research

Posted on:2006-07-25Degree:MasterType:Thesis
Country:ChinaCandidate:J Q GaoFull Text:PDF
GTID:2206360152980934Subject:Business Administration
Abstract/Summary:PDF Full Text Request
This paper will only study the progress management of petrochemical construction, given prior to site management, and will describe it according to the order of site construction. The content includes something such as:First, shaping the plan of construction progress and preparing for the kick-off. The plan must be particular and feasible. Such plan is extremely important for the success of project. Preparing for the kick-off mostly includes people and machines' arriving at their position in time, and water, power, gas's being ready on site.Second, controlling the progress effectively and timely during the construction. How to do it? We can use Ms Project or P3 to help us control the progress of project; Arrangements must be reasonable; Improving the construction level can shorten the time limit for the project; The more important is to improve the capability of managers themselves and to strengthen man management and to improve management level.Third, paying attention to make a summary after completing a project. To make a summary is a precondition of appraising the progress management and a ladder of improving controlling level.In a word, progress management of a project has a close connection with managers themselves, the corporation from project staff, many kinds of exterior and interior conditions. As a project manager, he must have very good integration capability and be good at man management, especially man management on the project management staff !...
Keywords/Search Tags:Petrochemical
PDF Full Text Request
Related items