With the increase of the span of the prestressed concrete beam bridge, it has become indispensable to efficaciously apply construction control to the project. This makes it required to choose suitable management pattern and erect MIS for beam bridge construction control on the basis of the trend of modern project management at the present time for improving efficiency. But in fact this kind of MIS have not be developed at present. Aiming at the lack of this kind of MIS, this paper discusses the representative management pattern applied in project and the developing of MIS of construction control for beam bridge(CCB-MIS) on the background of the Ma-An-Shi bridge, explains its development principle and introduces its design and working process . Its application on the bridge guided construction and acquired good effect. |